Southern California
HOME | ABOUT | CONTACT
866.449.2882
SolidWorks®
Current Articles | RSS Feed
A Southern California Machining company decreased pack time by 90%.
Read More
Reducing the turnaround time on returned units this San Diego Aerospace company saved over $23k in packaging costs with an innovative solution.
Decrease inspection times during Import/Export shipments.
An Aerospace Manufacturer in Southern California shipped airplane wings overseas. See how Valley Box saved the day on the destination end by downloading this client case study.
How one serviceman shipped his motorcycle overseas damage-free and was ready to ride instantly.
A Rod manufacturing facility went from a 36% return rate to 0% (Zero) with Tools from Valley Box. Read the client case study to see how they did it!
A Parts Distribution Warehouse went from 13% corrosion rate to a 0% (Zero) very easily. Download Valley Box Co.'s case study to see how they did it.
Bucky looks to Robox for advice on what to do about shipping his motorcycle.
Check out how a California Robotics manufacturer reduced the space used by stored parts from 100% down to 47%. Download a copy of this Valley Box Co. customer case study now!
A Scientific Equipment Company cuts costs on return shippers with the help of Valley Box Co. Download a copy of our packaging customer case study.
See how one Parts Machining Manufacturer reduced their packaging costs with a JIT Solution. Download this Valley Box case study now!